Laserfiche WebLink
Rio Tinto Energy America Page 2 of 2 <br />Colowyo Mine <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />August 1, 2006 <br />ADDENDUM TO 180 -DAY REPORT <br />NOTICE OF INTENT NUMBER CX- 2005 - 109 -11 <br />COLLOM (C & CHM) DRILL SITES <br />In the Collom project area, 57 drill sites had activity. Drill sites C- 05 -08, -50, -52 and -53 were <br />not completed and will not be completed. The respective drill and/or core holes on the drill sites <br />have been sealed and/or plugged using the method described in the NOI. No further activity is <br />planned for these sites. <br />No monitoring wells or piezometers were completed on any C -05 drill site. As of this date, all <br />drill sites have been reclaimed and topsoil replaced. These sites have been reseeded. <br />N:\ CCC_ ENG \LOM \GEOMODEL \Geomd120050MG Reports \AddmdumFina1180dayrptforO5.doc <br />