Laserfiche WebLink
3. List any additional changes to the original prospecting and reclamation plan or any <br />unexpected problems (such as unexpected water or artesian conditions <br />encountered). (Attach additional pages, if needed.) <br />No additional changes or problems were encountered during the period ending wit <br />t he date on this report. <br />4. When do you expect to complete all exploration and reclamation activities for this <br />project? A ll exploration and reclamation activities are finalized except as no <br />in the attachment. <br />5. Does the prospector wish this report to be considered confidential? See Rule <br />2.02.7(2). No If yes, attach a justification for the request. <br />6. Additional Comments: <br />Date: U6US7 / �G ��ifr�� lfz c1,4 <br />Signature of Authorized Representative <br />ta <br />e<tiya / /"4c <br />Company <br />(n /0O <br />N:\ CCC_ ENG \LOM \GEOMODEL \Geomdl2004 \DMG Reports \180dayrptfor04(02_05).doc <br />