Laserfiche WebLink
sheet 1 of 2 <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />Agency or organization name :DBMS <br />007 State :Colorado <br />09/12/2006 <br />ESC <br />County :Lorimer <br />Site : Gardels Pit <br />Permit or other job action :New 112 Application <br />Task description :Replace Topsoil <br /><., _.; . ; <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Cost Bre <br />Scraper work team -Scraper :Cat 627G <br />-Push dozer :Cat D8R Sedes 11- 8SU (2005) <br />PermiUjob # :M-2005-033 <br />Abbreviation :none <br />Filename : M033-007 <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader :INA <br />-Water truck :INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 dozer NA NA NA NA <br />Utilization-machine : 90 100 NA NA NA NA <br />-Ripper attachment : NA 0 NA NA NA NA <br />Ownerhip cosUhour : $56.90 $51.18 NA NA NA NA <br />Operating cosUhour: $108.45 $73.75 NA NA NA NA <br />Ripper op. cosUhour : NA $0.00 NA NA NA NA <br />Operator cosUhour : $32.96 $32.78 NA NA NA NA <br />Unit subtotals : $198.31 $157.70 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $554.32 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $554.32 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 48,739 LCY <br />factor : NA volume : 48, 739 LCY <br />Source of quantity take-off :Operator Estimate <br />Source of estimated swell factor : NA <br />