My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54826
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54826
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:49 PM
Creation date
11/20/2007 4:20:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005033
IBM Index Class Name
Permit File
Doc Date
9/12/2006
Doc Name
Reclamation Cost Estimate
From
DRMS
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 <br />Date : 09/12/2006 <br />User : ESC <br />State :Colorado <br />County : Ladmer <br />Site : Gardels Pit <br />Agency or organization name : DRMS <br />Permit or otherjob action :New 112 Applic <br />Task description : Bac~ll D-Pit <br />HOURLY EQUIPMENT COST <br />to 3h:1 v <br />Basic machine : Cat D10R - 10SU (2005) Horsepower : 570 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : 1-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $100.86 NA <br />Operating cosUhour : $132.31 100 <br />Ripper op.cosUhour : $0.00 0 <br />Operator cost/hour : $32.78 NA <br />Total unit cosUhour : $265.95 Total fleet cost/hour : x265.95 <br />MATERIAL QUANTITIES ~~ ~ ~~~ ~~~ <br />Initial Swell Loose <br />volume : 45,000 LCY factor : NA volume : 45,000 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Jab Condition Correction Factors Source <br />Average push distance : 300 feet <br />Unadjusted hourly production : 633.3 LCY/hr <br />Material consistency descdption <br />PaRly consolidated stockpile <br />Average push gradient : 0.00 % (1 <br />Average site a!litude : 5,000 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description <br />Decomposed rock - 25% Rock. 75% Eadh <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.00 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.48 <br />Adjusted unit production <br />Adjusted fleet production <br />HB) <br />300.99 LCY/hr <br />300.99 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 149.51 Hours <br />Unit cost : $0.884 /LCY Total job cost : x39,761 <br />PermiUjob# : M-2005-033 <br />Abbreviation :none <br />Filename : M033-005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.