Laserfiche WebLink
I~ <br />i <br />t <br />T880161 <br />Boulder Diversion Canal, will be from storage in a newly constructed <br />pond. <br />C. Water will be supplied from the South Boulder Diversion Canal for storage <br />in the pond. <br />4. In dry years the project will store water during the spring runoff period in <br />the Smart Reservoir for later use during the year. <br />-28- <br />