My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54803
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54803
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:48 PM
Creation date
11/20/2007 4:20:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
1/9/2004
Section_Exhibit Name
Volume 8A NPDES Permit Appendix
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTI <br />Page No. t <br />Pertnil No. COG-g500oC , <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />2. Stormwater Manaeement Plan (SWMPI • <br />A Stotmwater Management Plan (SWMP) shall be developed for the portion of each facility covered by this section of the permit. The <br />SWMP shall be prepazed in accordance with good engineering practices. (A registered engineer need not complete the plan.) <br />The plan shall identify potential sources of pollution (including sediment), which may reasonably be expected to affect the quality of <br />starmwater dischazges associated with the mining operation. Tn addition, the plan shall descnbe and ensure the implementation ofbest <br />management practices (BMPs), which will be used to reduce the pollutants in stormwater dischazges, associated with mining activity. <br />Mining operations must implement the provisions of the SWMP required under this part as a condition of this permit. The Division <br />reserves the right to request and review the plans, and to require additional measures to prevent and control pollution, as needed. <br />The SWMP shall describe all areas that have not been previously permitted, and which meet the definition of a stormwater dischazge u. <br />40 CFR 122.26. Examples of such azeas aze roads and railroad lines used for transportation to and from the site, outrlopes of ponds, <br />inactive loadouts, sites used for storage and maintenance of material handling equipment, and azeas granted small azea exemptions. <br />a) SWMP Contents <br />The SWMP shall include the following items, at a minimum: <br />1) Site Map <br />The plan shall provide a site map or maps, which indicate, at a minimum: <br />Mining site boundaries <br />Access and haul roads <br />- Stotmwater outfalls and an outline of the drainage azea of each stormwater outfall <br />- An estimate of the dtrection of flow <br />- Materials handling areas <br />- Each existing structural control measure to reduce pollutants in stotmwater runoff <br />- Areas used for storage or disposal of overburden, materials, soils or wastes, including tailings piles or ponds <br />- Areas used for mineral milling and processing <br />- Springs, streams, wetlands and other surface waters <br />- Location of mine drninage or any other process water dischazge points <br />- boundary of area that contributes runoff to outfalls that aze subject to effluent limitations guidelines. <br />- Date the map was prepazed <br />2) Description of Potential Pollutant Sources/Material Inventory <br />The plan shall provide a description of all potential sources (activities and materials), which tray reasonably be expected to add <br />pollutants to stormwater dischazges. Such sources tray include haul roads, equipment storage and maintenance areas, fuel <br />storage azeas, etc. <br />In each case where stormwater pollution potential exists, appropriate preventive measures must be taken and documented. <br />3) Stotmwater Quality Controls <br />Each mining site covered by this permit shall develop a description of stormwater quality controls appropriate for that site, and <br />implement such controls. The appropriateness and priorities of controls in the plan shall reflect identified potential sources of <br />pollutantr at the site. The description of stormwater quality controls shall address the following minimum cotttponentr, <br />including a schedule for implementing such controls: <br />a. SWMP Administrator -The SWMP shall identify a specific individual or individuals within the mining organization who is <br />responsible for developing the SWMP and assisting the mine operator in its implementation, maintenance, and rev <br />b. Materials Handline and Snill Prevention -Where materials can impact stormwater runoff, BMPs that reduce the potential <br />for contamination shall be described. For example, materials should be stored and handled in covered azeas whenever <br />possible to prevent contact with stormwater; fuels and other chemicals should be stored within berms or secondary <br />containment devices to prevent leaks and spills from entering stotmwater runoff. <br />
The URL can be used to link to this page
Your browser does not support the video tag.