Laserfiche WebLink
Equipment and labor costs <br />Backhoe or dozer 0 $60/hr x 11 sites x 2 hr/site =$1,320.00 <br />5. ReArade Drill Trails <br />Total length of drill trail: 3700 ft <br />trails aze assumed to be 25 ft wide <br />All trails along ridge tops on moderate slopes requiring <br />little earthwork <br />Regrade with small backhoe or dozer 0 $60/hr requires <br />approximately 1 hour per 275 ft. of trail <br />Equipment and labor costs <br />Backhoe or dozer 0 $60/hr x 3700 ft / 275 ft/hr = $807.27 <br />6. Reseeding Drill Sites and Traila <br />Revegetatioa coat per acre: $250 <br />Total acreage disturbed <br />Drill Bites - 11 x 100 x 40 / 43560 = 1.01 acres <br />Drill trails - 3700 x 25 / 43560 = 2.12 acres <br />Total 3.13 acres <br />Revegetatioa costs <br />3.13 acres x $250/acre = $ 782.50 <br />i 7. Mobilization Coats <br />Location is close to Trinidad where all equipment, supplies <br />and labor aze available. Use 1 hr of mobilization time for <br />each piece of equipment. <br />Backhoe <br />Dozer <br />Rig <br />$ 60~6~~ <br />60.00 <br />100.00 <br />Sub-total <br />Total Reclamation Cost <br />Round to <br />$ 220.00 <br />$15,729.77 <br />$15,800.00 <br /> <br />