My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54790
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:48 PM
Creation date
11/20/2007 4:19:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
SECTION 4.21 COAL EXPLORATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BONDING CALCULATIONS <br />ENERGY FUELS MINING COMPANY 1988-9 EXPLORATION PROGRAM <br />1. Sealing Drilled Holes <br />Aaeume: Each hole drilled will encounter aquifers requiring <br />a 50 ft. column of cement seal. The remainder of each hole <br />will be filled with abandonment fluid. <br />Total No of Drillholes: 18 <br />Drill hole diameter: 6 in <br />Total footage drilled: 5800ft <br />Gallons of fluid per linear foot 1.5 <br />Cost of cement seal material $.50 - $.70/ft use $.60/ft <br />Materials costa: <br />Cement - 18 holes x 50 ft x $.60/ft = $ 540.00 <br />Abandonment fluid 5800 f t - (18x50 f t) <br />- (18x10 ft) x 1.5 gal/ft x $.10/gal = 708.00 <br />Equipment and Labor Coats <br />Rig, water truck and 3-man crew - <br />$100/hr x 4 hrs/hole x 18 holes = 7200.00 <br />Water - $20/load x 2 loads/hole x 18 holes = 720.00. <br /> Sub-total $9168.00. <br />• 2. Plugging Drilled Holes <br />Place 1 non-slip octo-plug in each hole, mix 1 bag of cement <br />per hole and place cement in hole. <br />Materials costs: <br />Octo-plugs - $2.00 each x 18 holes = $ 36.00 <br />Cement - $12.00/bag x 18 holes = 216.00 <br />Labor Costa <br />2 man hours/hole 0 $15.00/hr x 18 holes = 540.00 <br />Sub-total $792.00 <br />3. Backfill Mud Pits <br />No. of pits: 22 <11 sites-2 pits each) <br />Size of pits: 20 ft x i6 ft x 6 ft <br />Backfill with backhoe or dozer 0 $60.00/hr <br />requires 2 hrs/pit <br />Equipment and labor costa <br />Backhoe or dozer 0 $60/hr x 22 pits x 2 hr/pit = $2,640.00 <br />4. Regrade Drill Sites <br />No. of sites: li - all on moderate slopes <br />• Size of sites: 100 x 40 = 4000 sq ft <br />Regrade with small backhoe or dozer 0 $60.00/hr <br />requires 2 hrs/site <br />
The URL can be used to link to this page
Your browser does not support the video tag.