Laserfiche WebLink
INDUSTRIAL DISCHARGE PERMIT INSPECTION ADDENDUM <br />12. Describe the physical condition of each discharge point. E it discharging? If so, al what flow? Outfalls 001.002. 003. 004 and 006 were <br />dischargine durin¢ inspection at relatively hieh volumes due to recent snowmelt. Specific Flows were not measured. <br />13. Is the perminee maintaining records as required vt the permit? Yes <br />14. Evaluate the potential for groundwater impact. Ponds may infilyate to eroundwater: however, due to their locations near surface waters. <br />most Flow. if occurring, would probably migrate to the surface waters. The facili[y's production is much lower than previous years and <br />Iinle activity is occurring that would impact eroundwater. <br />I5. Additional Cortunents: <br />Include a site sketch of the facility and treatment system. Refer to the permit. <br />