Laserfiche WebLink
COST SUMMARY <br />The preceding revised bond estimate demonstrates that the entire permit area can now be <br />reclaimed for 58,886,826. At the present time, the Division holds $7,300,000 in <br />reclamation bond. <br />SCC is increasing the current bond amount by S1,800,000 Ito 59,100,0001. The additions! <br />5213,174 will be used to cover any bond increases for miscellaneous future revisions. <br />PR03 11 Revised 4/03 <br />