Laserfiche WebLink
Powderhorn Coal Company <br />• Permit No. 11ME(i70F121 <br />Inial Approval <br />Page Z <br />made available to the Division for inspection upon request. <br />Coal and gob extraction and transfer shall not exceed 9,000 tons/day or 1,350,000 tons/year. <br />Coal and gob stockpiling shall not exceed 3,638 tons/day or 52,000 tons/year. <br />Note to Permit Holder: <br />The following emissions of total suspended particulates (TSP) and particulate matter of less than <br />ten microns (PM„) are estimated based an the production rates listed above. This information is <br />listed to inform the operator of the Division's analysis of the TSP and PM„ emissions. This <br />information is listed on the Division's emission inventory system. <br />Total Suspended Particulates: 17.7 lbs./hour or 51.51 tons/year <br />Particulate Matter (PM,o1: 8.4 Ibs./hour or 24.54 tons/year <br />5. A revised Air Pollutant Emission Notice (APEN) shall be filed when a significant change in actual <br />emissions occurs (above the level reported on the last APEN, submitted to the Division) as required <br />by Regulation No.3, Part A.II.C.2 as per the timetable in Regulation No.3, Part A.II.C.3. <br />6. In accordance with C.R.S. 25-7-114.1, the Air Pollutant Emission Notice (APEN) associated with <br />this permit is valid for a term of five years. The five year term for this APEN expires on December <br />• 27, 1999. A revised APEN shall be submitted no later than 30 days before the five year term <br />expires. <br />By: ~~ <br />Sunday A. Fadeyi <br />Permit Engineer <br />Mmilicaim; <br />077/0082/002 <br />111 Mnnid vwlar ircna. <br /> <br />Construction Permits Unit <br />Stationary Sources Program <br />Air Pollution Control Division <br />7 Rev.3-1-96 <br />