Laserfiche WebLink
` S. Placing <br />I <br />i <br />~i ~' Dump riprap in a manner to avoid segregation and to obtain maxi- <br />• mum density. Rearrange by hand or raking as necessary Co obtain <br />I <br />~ a reasonably flat and dense surface. Cover riprap with rock <br />spalls and rake into riprap to insure that all chinks between <br />i <br />larger rocks are well filled Eor a smooth and pleasing appear- <br />ance. <br />G1.10 - Cleanup <br />During the progress of, and upon completion of, the work under <br />this subdivision, promptly remove from the site all excess mater- <br />ial and. equipment, leaving the area in which work teas been com- <br />pleted ready for work by other trades. , <br /> <br />~~ <br />7 <br />~~ <br />'~ <br />~1 <br />5-14 <br />-,.._,~_ <br />