My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54544
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54544
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:37 PM
Creation date
11/20/2007 4:12:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993080
IBM Index Class Name
Permit File
Doc Date
2/28/1994
Doc Name
M-93-080 CALHAN PIT SUMMITE BRICK & TILE ADEQUACY LETTER RESPONSE
From
LLOYD V BUCK BARNHART
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• '94-03-02 14 46 PUEBLO TITLE P.6 <br />e~ • • <br />Mr. Hob Oswald <br />Division of Minerals & Geology <br />March 2, 1494 <br />Page 3 <br />10. Reclamation Map needs <br />applicant's best projection of <br />Ration of final contours, site <br />to show information on the <br />the extent of necessary recla- <br />drainage, stockpile locations. <br />Present reclamation projections are for a SH:1V slope on the <br />north perimeter to a level pit floor with approximately a 1% <br />slope toward the south. The pit is proposed to daylight at <br />the south perimeter. Site drainage will follow the 1',G slope <br />to the south, which will be flat enough to slow surfece run- <br />off. There will be no stockpiles when reclamation is <br />complete. <br />I1. Exhibit G states the applicant has cOVered this op- <br />eration's need for acquiring a NPDES permit through a Brick <br />Institute ofi American Group Stormwater Discharge Permit <br />N1O24. Does this mean that the pit would otherwise require a <br />NPDES Permit. <br />J~ <br />,~ It is this consultant's experience that this operation would <br />not require a NPDES Permit. However, with the Federal Clean <br />Water Act and Colorado's response in the Stormwater Discharge <br />Permit requirements, it appears that only a Stormwater Dis- <br />charge Permit permit will be required in this instance. <br />12. Reclamation costs should reflect any mobilization/ <br />demobilization of equipment. n„ _ ~~~ -j-ir ] dam, ~~~ f <br />1~"" y ~ RL~a.a..(, , <br />~ This item was calculated at ~60O,~based on moving equipment <br />L1~~= . from Colorado Springs and w~--rrrtllude~~-n-the Indirect Costs. <br />~~If equipment could be leased in the Cal_han_a_rea, this Cost <br />would be lower. The bond is calculated on a maximum of SOA, <br />but the mining and reclamation plan will probably never af- <br />fect that much at any one time. <br />13_ Exhibit R must include proof of receipt of the notifica- <br />tions sent to the County and SCD. Signed return receipts are <br />\i~ ~ an example of what is acceptable. Please provide this. <br />My records indicate that <br />signed Return Receipt have <br />/~~~''1(~ find them, let me know and <br />` y,,p~" l w ~k4 i • ~ <br />~v~ elSewl.e''e <br />the Paid receipt for mailing and <br />already been sent. If you do not <br />I will send another coDY. <br />
The URL can be used to link to this page
Your browser does not support the video tag.