Laserfiche WebLink
<br />James Dillie <br />Division of Minerals and Geology <br />Page 3 of 3 <br />7) It is our understanding that the financial warranty needs to be revised based on the maximum <br />disturbance of 9.12 acres. Based on the change in proposed grass seed (Item 6), and this larger <br />area, the Estimate of Reclamation Costs (Exhibit D) is now revised to the following: <br />Topsoiling Estimate, 6" over 9.12 ac. <br />7360 cu. yds. <br />Materials -None, stockpiles on site, adjacent to reclamation <br />Labor - $30/Hr (x 180 Hrs) _ $5400.00 <br />Equipment - $35lHr (x 180 Hrs) = 6300.00 <br />Seeding Estimate, 9.12 ac. @ 15 Ibs/ac. <br />Materials - (See below) <br />Labor - $15/ac (x 9.12 ac.) _ <br />Equipment - Included in Labor Price <br />SUBTOTAL = $11,700.00 <br />140 Ibs. <br />$515.00 <br />137.00 <br />SUBTOTAL = $652.00 <br />TOTAL = $12,352.00 <br />Seed Estimate based on the following prices and assuming 7% sales tax: <br />Crested Wheatgrass - $2.19/16 <br />Western Wheatgrass - 6.75/16 <br />Smooth Brome - 1.89/16 <br />Mountain Brome - 3.50/16 <br />8) Proof of notification to adjacent landowners was sent by the applicant under separate cover in <br />response to the Adequacy Letter. <br />It is our understanding that the extended decision due date is October 15, 2000. We have <br />attempted to address each item in the Adequacy Letter and make the necessary revisions. [f there <br />are further issues or questions, we will make every effort to address them accordingly. We and <br />our clients feel you have been extremely helpful throughout this process. We truly appreciate <br />your professionalism and your courtesy. <br />Sin ely, <br />Teresa-Koo~a <br />Arkansas Valley Surveying <br />