My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE54436
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE54436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:57:32 PM
Creation date
11/20/2007 4:09:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
Permit File
Doc Name
APPLICATION FOR A MILLING AND RECLAMATION PERMIT GOLD HILL MILL LIMITED IMPACT PERMIT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br />2.) a.) Other than the monzonite, we will not afore more than 200 <br />gallons of chemicals at any one time. If a spill wotld occur, the <br />mill is deaieYred to flush all of the waste chemical into the tail- <br />ings pond. V <br />1. i The capacity of the tanks are as follows: <br />'75,Illlil gallons <br />S,OOG galioua <br />3,000 oaIlons <br />3.u00 eallona <br />X00 gallons don;zatic water <br />b.) Tne general characteriaiica of the ore will begold-silver tellur- <br />ides and 6„ld-silver „ilfides. ??'e are including, as evhibit C-2B, <br />the engineering nn a lined tailing pond. We have elan installed <br />~ monitoring wells that will be monitored on a quarterly basis <br />for the following items: Ag, Cu, Pg, Sn, As, Hg, Ba, Be, Fe, and <br />pH. <br />c.) We have installed drainage ditches from the previous permit, and <br />these ditches have been certified by TZA (copy of certicication <br />is attached). <br />The accompanying guidelines have been followed in designing the mill to <br />process the ores that will be produced from the C.O.M., Inc.: <br />1. 'Ilse n;illing operation Lae been designed to Lave the <br />capability of processing the several types of ores that <br />are found in the Gold Hill minlIIg district as well as <br />other properties along the front range. These ores <br />will mnaist ot'gold-silver telltrride++, and various <br />combuiationa ofgold-silver-lewd-zinc-copper auifidea. <br />2. In order to process both teiluricie and suicide ores. the <br />null Lae been designed as a con:poaite ayatecn of <br />gravity and flotation concentration. <br />3. Initial mill capacity will not exceed 50 tons of ore in a <br />24 hour period. <br />C.O.M. Inc. ie currently operating the M e"~ mine, which Las sufficient proven <br />ore reserves to auatam ties miilmg operation for some time to come. <br />The planned gravity and flotation concentration mill is situated on the <br />patented Oscar lode mining claim, which is owned by C.O.M. Inc. The mill <br />huilding was constructed just to the northeast of'the Oscar mine shaft, on <br />gently eloping terrain with a 14 percent gradient (eee Map A}. It is located <br />
The URL can be used to link to this page
Your browser does not support the video tag.