Laserfiche WebLink
The Operator will keep on Pile, for inspection by the Division, <br />records of its weed control activities. The weed control records <br />• will document the location where weed control was performed, the <br />type of weed control employed, and the date when the weed control <br />was performed. As part of its annual reclamation report required <br />under Rule 2.04.13, the Operatar will summarize its weed control <br />activities for the year and include a map which will show all <br />areas where weed control was performed. <br />Measures for Determining Success of Revegetation <br />Because the area has been previously disturbed by past under- <br />ground operations, the success of reclamation at the planned <br />surface facilities and portal entries will be determined as <br />explained in Section 4.15.10. <br />Reclamation Soil Testing Plan <br />In order to assure that the reapplied topsoil will support the <br />proposed post-mining land use, a soils sampling program will be <br />implemented. After spreading the topsoil on the regraded area, a <br />sampling program will be initiated to follow recommendations of <br />the Division. <br />Specific parameters to be sampled are nitrate and nitrogen re- <br />ported in parts per million (ppm); organic matter to determine <br />the nitrate producing <br />• <br />• 2.05-42a <br />New June 29, 1990 <br />