My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23839
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23839
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:10 PM
Creation date
11/20/2007 4:07:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981021
IBM Index Class Name
Hydrology
Doc Date
4/1/1994
Doc Name
STORMWATER MANAGEMENT PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;~ <br /><. <br />• 3.2.2. GNIG Mina Waste Pile (Reference Map 7) <br />SWMP: Grade the waste pile leaving it slightly concave in the center to control <br />stormwater migration. Where necessary, the construction, installation and/or <br />application of contour,., berms, silt fences, straw bales, water bars, fertilizatioNre- <br />' vegetation will be initiated to mitigate stormwater surface erosion and stormwater <br />migration. All mitigation measures will be done on the original foot-print (affected area) <br />and in accordance with Federal and State Regulations. <br />' 3.2.3. Carnation Mine Waste Piles (Reference Map 8) <br />SWMP: Where necessary, the construction, installation and/or application of contours, <br />berms, silt fences, straw bales, water bars, fertilizatioNre-vegetation will be initiated to <br />' mitigate stormwater surface erosion and stormwater migration. On final reclamation the <br />the waste pile will be graded, leaving it slightly concave in the center to control <br />stormwater migration. All mitigation measures will be done on the original foot-print <br />' (affected area) and in accordance with Federal and State Regulations. <br />3.2.4. St,lude Mine Waste Pite (Reference Map 8) <br />' SWMP: Where necessary, the construction, installation and/or application of contours, <br />berms, sift fences, straw bales, water bars, fertilizatioNre-vegetation will be initiated to <br />' mitigate stormwater surface erosion and stormwater migration. On final reclamation the <br />the waste pile will be graded, leaving it slightly concave in the center to control <br />stormwater migration. All mitigation measures will be done on the original foot-print <br />' (affected area) and in accordance with Federal and State Regulations. <br />' 3.2.5. West Sunday Mine Waste Pile (Reference Map 9) <br />SWMP: Where necessary, the construction, installation and/or application of contours, <br />berms, silt fences, stravr bales, water bars, fertilizatioNre-vegetation will be initiated to <br />' mitigate stomtwater surface erosion and stormwater migration. On final reclamation the <br />the waste pile will be graded, leaving it slightly concave in the center to control <br />' stormwater migration. All mitigation measures will be done on the original foot-print <br />(affected area) and in accordance with Federal and State Regulations. <br />3.2.8. Topaz Mine Waste Pile (Reference Map 10) <br />SWMP: ,Grade the waste pile leaving it slightly concave in the center to control <br />' stormwater migration. Where necessary, the construction, installation and/or <br />application of contours, berms, silt fences, straw bales, water bars, fertilizatioNre- <br />vegetation will be initia3ted to mitigate stormwater surface erosion and stormwater <br />' migration. All mitigation measures will be done on the original foot-print (affected area) <br />and in accordance with IFederal and State Regulations. <br /> <br /> <br /> a <br />t <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.