Laserfiche WebLink
3. stormwater Quality Controls -Best Management Practices <br />1 3.1. Burro Area Mlnes (Reference Maps 2,4,5,6) <br />' 3.1.1. Bwrro Adit Waste Pilea (Reference Map 4) <br />SWMP: Grade the waste pile leaving it slightly concave in the center to control <br />' stormwater migration. Where necessary, the construction, installation and/or <br />application of contour::, berms, silt fences, straw bales, water bars, fertilizatioNre- <br />vegetation will be initiated to mitigate stormwater surface erosion and stormwater <br />migration. All mitigation measures will be done on the original foot-print (affected area) <br />and in accordance with Federal and State Regulations. <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />I' <br />3.1.2. BUITO No. 3 Waste Pile (Reference Map 5) <br />SWMP: Grade the waste pile leaving it slightly concave in the center to control <br />stormwater migration. Where necessary, the construction, installation and/or <br />application of contours., berms, silt fences, straw bales, water bars, fertilizationlre- <br />vegetation will be initiated to mitigate stormwater surface erosion and stormwater <br />migration. All mitigation measures will be done on the original foot-print (affected area) <br />and in accordance with Federal and State Regulations. <br />3.1.3. Bu1T0 No. 5 Waste Pile (Reference Map 5) <br />SWMP: Grade the waste pile leaving it slightly concave in the center to control <br />stormwater migration. Where necessary, the construction, installation and/or <br />application of contours, berms, silt fences, straw bales, water bars, fertilization/re- <br />vegetation will be initiated to mitigate stormwater surface erosion and stormwater <br />migration. All mitigation measures will be done on the original foot-print (affected area) <br />and in accordance with Federal and State Regulations. <br />3.1.4. Burro No. 7 Waste Pile (Reference Map 6) <br />SWMP: Grade the waste pile leaving it slightly concave in the center to control <br />stormwater migration. Where necessary, the construction, installation and/or <br />application of contours, berms, silt fences, straw bales, water bars, fertilization/re- <br />vegetation will be initiated to mitigate stormwater surface erosion and stormwater <br />migration. All mitigation measures will be done on the original foot-print (affected area) <br />and in accordance with IFederal and State Regulations. <br />3.2. Sunday Area Mines (Reference Maps 3,7,8,9,10,11) <br />3.2.1. Sunday Mine Waste Piles (Reference Map 7) <br />SWMP: Where necessary, the construction, installation and/or application of contours, <br />berms, sift fences, straw bales, water bars, fertilizatioNre-vegetation will be initiated to <br />mitigate stormwater surface erosion and stormwater migration. On final reclamation the <br />the waste pile will be graded, leaving it slightly concave in the center to control <br />stormwater migration. All mitigation measures will be done on the original foot-print <br />(affected area) and in accordance with Federal and State Regulations. <br />7 <br /> <br />