Laserfiche WebLink
Memo to Russ Means 4 November 14, 2007 <br />Whirlwind Mine Bulkhead Costs File No. M-2007-044 <br />Task and Cost Item Quantity Extended Cost <br />Terry Tunnel, contract labor for pour $864.00 <br />Terry Tunnel, outside man <br />Decline Bulkheads (both), general labor <br />Decline Bulkheads (both), overtime during pour <br />Decline Bulkheads (both), salary (management) <br />Decline Bulkheads (both), contract labor <br />Decline Bulkheads (both), outside man <br />Pack Rat, general labor <br />Pack Rat, overtime during pour <br />Pack Rat, salary (management) during pour <br />Pack Rat, contract labor for pour <br />Pack Rat, outside man <br />Total, all Whirlwind Bulkheads <br />Strip Forms, Move Equipment, and Grout Bulkhead <br />Terry Tunnel, general labor <br />Decline Bulkheads (both) <br />Pack Rat <br />Total, all Whirlwind Bulkheads <br />Install Ventilation <br />Terry Tunnel, general labor <br />Lower Decline Bulkhead, general labor <br />Upper Decline Bulkhead, general labor <br />Pack Rat, general labor <br />Total, all Whirlwind Bulkheads <br />Subtotal Labor, includes overhead and profit <br />Add 5% DRMS administration required by statute <br />Labor Component of Bulkhead Bond <br />100 hrs. <br />890 hrs. x 2 x 0.21 x $41.65/hr. _ $15568.77 <br />$2157.30 x 2 x 0.21 = $906.07 <br />$2987.05 x 2 x 0.21 = $1254.56 <br />$864.00 x 2 x 0.21 = $362.88 <br />100 hrs. x 2 x 0.21 x $41.65/hr. _ $1749.30 <br />890 hrs. x 0.38 x $41.65/hr. _ $14086.03 <br />$2157.30 x 0.38 = $819.77 <br />$2987.05 x 0.38 = $1135.08 <br />$864.00 x 0.38 = $328.32 <br />100 hrs. x 0.38 x $41.65/hr. _ $1582.70 <br />$37793.48 <br />120 hrs. <br />120 hrs. x 2 x 1.07 x $41.65/hr. _ $10695.72 <br />120 hrs. x 1.07 x $41.65/hr. _ $5347.86 <br />40 hrs. <br />40 hrs. x 0.65 x $41.65/hr. _ $1082.90 <br />40 hrs. x 0.59 x $41.65/hr. _ $982.94 <br />40 hrs. x 0.62 x $41.65/hr. _ $1032.92 <br />$16043.58 <br />$3098.76 <br />$162,435.80 <br />8121.79 <br />$170,558.00 <br />Sunalies, Parts, Eguiument Rental, and Engineering Costs, including Overhead and ProSt <br />Task and Cost Item Ouantity Extended Cost <br />Set Rebar Anchors and Fine Site Cleaning <br />Terry Tunnel <br />Sand blaster <br />Non-shrink grout, 1-bag <br />Sand blaster sand, #30 grit, <br />Decline Bulkheads (both) <br />Sand blaster <br />Non-shrink grout, 1-bag <br />Sand blaster sand, #30 grit, <br />$20/day x 3 days <br />$10.16 <br />1001b. bag $7.36/bag x 3 bags <br />$20/day x 3 days x 2 x 0.21 x 1.5 <br />$10.16 x 2 x 1.5 <br />1001b. bag $7.36/bag x 2 x 1.5 <br />$37.80 <br />$30.48 <br />$22.08 <br />Pack Rat <br />