Laserfiche WebLink
Page 3 <br />RECLAMATION TIMETABLE <br />Due to the small area involved and the underground nature <br />of the mine, constant use of the disturbed area is necessary, <br />and reclamation cannot begin until all mining activity has <br />ceased. Except for stockpiling and stabilization of toppsoil, <br />the reclamation process will not begin while minim is in <br />progress. <br />Within five years after reclamation has begun, the Following <br />activities will be completed: <br />1. Sealing of adits, shafts, ventholes, etc. <br />2. Removal of surface buildings <br />3. Grading of waste dump and other affected <br />land <br />4. Preparation of seedbed, where applicable <br />5. Revegetation, where applicable <br />A description of grading, seeding, fertilization, revege- <br />tation, and topsoiling may be found under the section entitled <br />"Reclamation Performance Standards". <br /> <br /> <br />