Laserfiche WebLink
TABLE OF DISTURBANCE <br />The acreages presented in this table are for a point in time when <br />the disturbance is maximized. At this point the dredge will be at <br />the southern end of a mining phase so a portion of a permanent lake <br />and shoreline is present along with backfilled land from the slurry <br />pipeline. At the slowdown of the annual mining season (November), <br />20 acres will have been mined that year. <br />Major <br />1. 5.0 acres New lake water surface <br />2. 15.0 Backfilled land by the slurry pipeline <br />3. 0.2 Shoreline on permanent lake, 466 if <br />4. 0.1 Topsoil stockpile, 38,000 cy <br />5. 0.4 Overburden stockpile, 155,000 cy <br />6. 0.5 Previous stockpile area <br />------------------------------------------------------------ <br />21.2 acres Subtotal ' <br />Moderate <br />7. 15.0 acres Overburden and topsoil distributed on <br />backfilled land <br />8. 0.2. Shoreline graded with topsoil and overburden <br />9. 0.8 Railroad spur, 2060 if x 15 if <br />10. 9.8 Mine access roads, 2 miles x 20 if <br />11. 40.0 Plant processing area <br />12. 0.7 Field conveyor, 1 mile x 6 if <br />------------------------------------------------------------- <br />61.5 acres Subtotal <br />Minor <br />13. 15.0 acres Recently seeded backfilled land <br />14. 0.2 Recently seeded shoreline <br />15. 15.0 One year grass growth, backfilled land <br />16. 0.2 One year grass growth, shoreline <br />17. 0.1 Planted wetland <br />---------- <br />---- -------------- <br />30.5 acres ----------- <br />Subtotal ------------------- <br /> 113.2 acres TOTAL <br />93171dstb.tbl <br />