Laserfiche WebLink
<br />PHASE 3: Mining will progress around the perimeter of the site and concurrent <br />reclamation of the reservoir liner will be completed. As the reservoir liner <br />is completed the groundwater collection trench will also be completed. <br />Dewatering of the mining area will be done to the two recharge ponds. As <br />lining progresses around the perimeter of the site, the water pumped from <br />the pit will decrease and the utilization of the groundwater collection <br />trench will be increased to divert water to the recharge ponds. The <br />groundwater collection trench will be utilized on a permanent basis after <br />Phase 3 mining is completed. <br />PHASE 4: Minimal dewatering will be required during this phase of mining because <br />the entire perimeter of the site will be sealed from the surrounding water <br />table. Any dewatering will be pumped into the recharge ponds. <br />