<br />Connell Resources <br />Timnath Connell Pit <br />August 24, 1999 <br /> <br />PROPOSED GROUNDWATER CONTROL AND ROUTING SYSTEM <br />• Two recharge ponds will be excavated on the south side of the site that will be <br />utilized for rechazging groundwater to the aquifer downstream of the reservoir liner. <br />• Three groundwater collection trenches will be excavated on the north side, into the <br />undisturbed sand and gravel to a depth of approximately six feet that will be utilized <br />for capturing groundwater and diverting the water to the rechazge ponds. <br />• Two trenches will be located along the north end of the property and one will be <br />located along the west property line. <br />• The trench along the west property line will flow directly into the two rechazge <br />ponds. <br />• Culverts will be used to connect the trenches to allow flow between the trenches. <br />• Agate will be installed on the culvert between the trenches at the northwest corner of <br />the site and a gate will be installed on the culvert between the trench and an existing <br />culvert under County Road 5 (culvert empties to the Poudre River). <br />• The northwest gate will be operated to control groundwater movement azound the site <br />to maintain natural groundwater levels on [he north and south side of the lined <br />reservoir. <br />• The northeast gate will be used to divert water to the river in the event that the <br />mounding of the water table on the north is not being fully controlled by routing <br />water to the recharge ponds. <br />• The six monitoring wells installed on site will be used for monitoring groundwater <br />levels for the operation of the drain system. <br />• A siltation pond will be created for the dewatering water to settle out any fines/silt <br />prior to the water being routed into the recharge ponds. Once dewatering is no longer <br />needed, the siltation pond will be removed. <br />MINE DEWATERING AND TRENCH INSTALLATION <br />PHASE 1: Rechazge ponds will be excavated to bedrock. The south perimeter of the <br />recharge ponds will be mined at 3:1 (H:V) slopes and no backfill material <br />will be place along the slopes in order to maintain an unrestricted flow to <br />the aquifer. As the east recharge pond is excavated, the groundwater will <br />be dewatered to Mallard Creek through the existing drain tile. During the <br />excavation of the west recharge pond, the groundwater will be dewatered <br />to the east recharge pond. <br />PHASE 2: During the mining of Phase 2 the groundwater will be pumped into the <br />two recharge ponds. As Phase 2 is reclaimed the groundwater collection <br />trench will be excavated. The trench will be used as needed during Phase <br />2 to maximize the groundwater flow to the dewatering ponds. <br />