Laserfiche WebLink
EXHIBIT "L" <br />RECLAMATION COST <br />1 CUT BANK SLOPES <br />2 REVEGETATE BANK SLOPES <br />3 FERTILIZER- available N 8 P SEE ABOVE <br />4 N/A <br />5 SCRIFIVING SEE ITEM q 1 ABOVE <br />6 SEEDBED PREPERATION and PLANTING SEE ITEM 2 ABC <br />7 MULCHING HAY or STRAW SEE ITEM Y 2 ABOVE <br />6 WEED CONTROL <br />9 MOBILIZATION 8 DEMOBILIZATION tram WALSENBURG <br />1O JOB SUPERINTENDENT <br />TOTAL DIRECT COST <br />INDIRECT COST OVERHEAD and PROFIT <br />PUBLIC LIABILITY INSURANCE <br />CONTRACTOR PERFORMANCE BOND COST <br />CONTRACTOR PROFIT <br />orY. urvlrcosr uNlr <br />aaaoo s1.1zs LCY <br />2z 3661.55 ACRE <br /> so.oo ACRE <br /> ao.oo LCY <br /> so 0o ACRE <br /> So.oo ACRE <br /> so.oo ACRE <br />1o aso.oa HOURS <br />1 31.50000 L$ <br />176 $33.35 HOURS <br />DMG PROJECT ADMINISTRATION EXPENSE <br />TOTAL PERFORMANCE BOND AMOUNT <br />PROJECT NAME: SAND ARROYO PIT <br />1.55% <br />1.05% <br />10.00% <br />9.25% <br />COST/ACRE <br />cosy <br />544,960.00 <br />314,554.10 <br />30.00 <br />So oa <br />50.00 <br />50.00 <br />30.00 <br />5500.00 <br />51,500 00 <br />55,976 30 <br />a6T.aTO.4o <br />$1,045.79 <br />$708.44 <br />$6,747.04 <br />$6,241.01 <br />$82,212.68 <br />se.zzl.2z <br />