Laserfiche WebLink
EXHIBIT "L" <br />RECLAMATION COST <br />. t CUT BANK SLOPES <br />2 REVEGETATE BANK SLOPES <br />3 FERTILIZER- available N 8 P SEE ABOVE <br />4 N/A <br />5 SCRIFIYING SEE ITEM # 1 ABOVE <br />6 SEEDBED PREPERATION and PLANTING SEE ITEM 2 ABC <br />7 MULCHING HAY or STRAW SEE ITEM # 2 ABOVE <br />B WEED CONTROL <br />9 M08ILIZATION 8 DEMOBILIZATION from WALSENBURG <br />10 JOB SUPERINTENDENT <br />TOTAL DIRECT COST <br />INDIRECT COST OVERHEAD and PROFIT <br />PUBLIC LIABILITY INSURANCE <br />CONTRACTOR PERFORMANCE BONG COST <br />CONTRACTOR PROFIT <br />arr. urolrcosr uNlr <br />40000 si.izs LCY <br />2z sB6~.s5 ACRE <br /> Eo.oo ACRE <br /> ao.oo LCY <br /> Ea.oo ACRE <br /> Eo.aa ACRE <br /> Eo.oo ACRE <br />~o Eso.ao HOURS <br />i ar,soo.oo LS <br />178 53335 HOURS <br />1.55% <br />1.05% <br />10.00% <br />DMG PROJECT ADMINISTRATION EXPENSE <br />TOTAL PERFORMANCE BOND AMOUNT <br />PROJECr NAME: SAND ARROYO PIT <br />9.25% <br />COSTlACRE <br />cosr <br />544,980.00 <br />514,554.10 <br />50.00 <br />ao.oo <br />x0.00 <br />ao ao <br />50.00 <br />asoo.oo <br />a~.soo 00 <br />55,936.30 <br />a67,470.40 <br />$1,045.79 <br />$706 44 <br />$6,747.04 <br />$6,241.01 <br />$82,212.68 <br />Ee,zz/.z7 <br />