Laserfiche WebLink
(DECEIVED OCT - 2 1992 <br />QUARTERLY POND INSPECTION REPORT <br />OPERATOR: TERROR CREEK COMPANY QUARTER: THIRD QUARTER 1992 <br />MINE: TERROR CREEK LOADOUT DATE OF INSPECTION: SEPTEMBER 30, 1992 <br />POND IDENTIFICATION #1 ({2 <br />TYPE OF POND SEDIMENT DUGOUT <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL 6" DRY <br />SED ($ total storage) 0$ N/A <br />OUTFLOW (cfs) NONE NONE <br />FEATURES PROBLEM COMMENTS <br />EROSIONAL: YES NO <br /> <br />Rills 6 Gulleys X <br />Inadequate Vegetation X <br />Outlet Channel Erosion X <br />Burrows x <br />Other X <br />STRUCTURAL: <br />Differential Settling X <br />Cracks or slides X <br />Seepage X <br />Other X <br />APPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device Clogged X <br />Faulty Gates, Etc. X <br />Other X <br />ADDITIONAL COMMENTS• The dugout and did not a pear to have had an <br />h <br />~ f <br />t th <br />tl <br />~ <br />f <br />i <br />i <br />h <br />i <br />ti <br />i <br />i <br />e <br />o <br />on. T <br />e s <br />ence a <br />e ou <br />water <br />n <br />t s <br />nce t <br />e last <br />nspec <br />l <br />dugout pond was in good shape and functional. The sediment level in the <br />ql pond was about 3 feet below the pprinciple spillway. The design <br />i <br />i <br />d <br />i <br />s 0$ sed <br />ment bu <br />l <br />-up <br />sediment level is 1.5 feet below,,therefore there <br />in the pond. The valve on the primary spillway was functional and the <br />spillway was clear. The emergency spillway was clear and functional. <br />MAINTENANCE REQUIRED: NONE <br /> <br />NAME OF INSPECTOR: Jim Stover S-~pUEe ~/_3o.°~Z r1.E.tk i4Z30 <br />ic~-1 ~~L <br />~ ~ ~ ~~ ~~ b~~ ~ 5 <br />