My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23699
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23699
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:44:06 PM
Creation date
11/20/2007 4:00:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1983059
IBM Index Class Name
Hydrology
Doc Date
7/21/1997
Doc Name
QUARTERLY POND INSPECTION REPORT
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />tt, .. - <br />:, <br />QUARTERLY POND INSPECTION REPORT <br /> DlviJi~o.~~,= <br /> MINERA x ~_ _: _ <br />OPERATOR: TERROR CREEK COMPANY QUARTER: FOURTH QUARTER 1992 <br />MINE: TERROR CREEK LOADOUT DATE OF INSPECTION: DECEMBER 2, 1992 <br />POND IDENTIFICATION #1 #2 <br />TYPE OF POND SEDIMENT DUGOUT <br />STATUS DURING INSPECTION: <br />APPROXIMATE WATER LEVEL. 6" ICE 2" SNOW <br />SED ($ total storage) 0$ N/A <br />~. <br />OUTFLOSQ_ (cfs) NONE <br />NONE <br />~~ _: <br />FEATUI2ES.>t. PROBLEM COMMENTS <br />EROSIONAL: YES NO - ~ <br />, <br />` <br />kr <br />. - <br />. <br />Rills & Gulleys X <br />Inadequate Vegetation X <br />Outlet Channel Erosion X <br />Burrows x <br />Other X <br />STRUCTURAL: <br />Differential Settling X <br />Cracks or Slides X <br />Seepage X <br />Other X <br />APPURTENANT STRUCTURES: <br />Defective Spillways X <br />Dewater Device Clogged X <br />Faul*_y Gates, Etc. X <br />Other X <br />A~DITIONA7, COMMENTS: The ice level in the sediment pgnd was about <br />eighteen inches below the rimary spillway. The design sediment level <br />i <br />for thg #1 pond,is 1.~ fee below the primary s <br />llway, therefore <br />~ <br />he primary spillway was <br />there is 0$ sediment in #1 pond. The valve on <br />functional and the spillway was clear and snow covered. <br />The dt}gout pond was snow covered. ~t did not appear ghat this pond,had <br />contained any water since the last inspection. The silt fence was in <br />good condition and operational. <br />MAINTENANCE REQUIRED: NONE <br />NAME OF INSPECTOR: Jim Stover ~ ~ G . ~} I~ Yap <br />12 -~"9 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.