Laserfiche WebLink
<br />EXHIBIT "E" <br />RECLAMATION PLAN <br />1. After the material has been removed from a portion of the pit area of a size to <br />be reclaimed, oversize and rejected material will be placed in these areas and <br />slopes of excavated areas will be contoured to blend with the surrounding terrain. <br />2. The slopes will be variable but not to exceed 2:1 (two feet horizontal to 1 foot <br />vertical). <br />3. The floor of the pit will be smoothed and graded to drain with the natural drainage. <br />4. Areas of the pit in which work has been completed will be reclaimed by spreading <br />the finer rejected materials over the area and seeding of these areas will be <br />done to the best of our ability. <br />