Laserfiche WebLink
-S S S C~i•til -- <br />C~~S~ <br />/ I- moo ~ - D3 9 <br />STATE OF COLORADO <br />OfF1CE OF THE STA7E ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Stree4 Room 818 v <br />Denver, Colorado 80203 Response to Reclamation Permit Application Consideration <br />Phme (303) 866-3501 <br />FAX 1303) 866-3589 <br />v~ww.water.srate.co.us <br />DATE: June 16, 2004 <br />~~~~ <br />~ 18T6 ~` <br />RECE! V~' ~`~ <br />/ sell Geroge <br />J Fxecufive Director <br />V ~ 2~U6 F1al D. Simpson, P.E. <br />TO: Steve S. Shue ,Senior Environmental Protection S ecialist ~~ ~~ Srare Erigkieer <br />y P "Division ~f Minerals enA Geology <br />CC: Division 5 Office; District 70 Water Commissioner <br />FROM: Craig M. Lis, P.E. ~~~ <br />RE: Operator: Chevron Shale Oii Company, North Cleaz Creek Construction Materials <br />Mine, File No. M-06-039 <br />Section 4, Twp 5 S, Rng 98 W, 6th P.M., GarFeld County <br />Landowner- Chevron Shale Oil Company <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. _ <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclarnation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, the applicant wilt need to obtain either a gravel pit or other type <br />of welt pertni[, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, [he applicant trots[ conduct a field inspection of the site and document the <br />locations of all wells within 600 feet mile of the permit azea. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or contact this office regazding the <br />600 foot spacing notification/hearing process. <br />^ The proposed operation may have potential impact on existing water rights neaz the project location. Please <br />provide evidence that the proposed project will not alter or impact the historic operation of existing water rights. <br />® The applicant has indicated plans to use other water for: dust control uses at the permit site. The applicant will <br />need to provide evidence to this office that the water is permitted or decreed for such uses. <br />® Other. Stotm water must be released to the stream within 72-hours of impoundment. <br />COMMENTS: <br />