Laserfiche WebLink
STATE HIGHWAY ACCESS PERMIT #399055 June 7, 1999 <br />Issued to Bowie Resources. Inc. <br />• TERMS & CONDITIONS (cont'd) <br />37. The Pzrmiuee shall do all final signing and pavemem striping or the contractor in conformance with the <br />Dzparunzm's M 8 S standards and the M.U.T.C.D., unless otherwise agreed to by the Department and the <br />Permittee. A final signing and pavement striping plan shall he submitted to the Region 3 Traffic Engineer a <br />minimum o(45 working days prior to commencement of work. No work shall begin without prior approval and <br />authorization from the Department. <br />38. Thz roadway shoulder shall bz widzned to 4 feet along the spied changz lanes and surfaced with HBP in <br />accordance with the Department specificauons. The shoulder widening along through lanes shall be no less than 4 <br />feet paved or match existine and paved. <br />39. The access shall he consvucted perpendicular to the travel lanes o(the State Highwa}' for a minimum distance of <br />50 feet. and shall slope down and away from the adjacem pavement edge at a rate of 2%r grade for a minimum of <br />20 fezt. If curb and gutter are present. the slope shall be calculated From pan line to pan line. An}' revisions to this <br />requirement shall be subject to Department review and approval prior to commencement of an}' work within the <br />highway right-o6wa}'. <br />40. The access shall be completed in an expeditious and safe manner and shall be finished w'i[hin 45 days from <br />initiation of construction within State Highway right-of-wa}'. <br />41. Pursuant to section 4.9(3) of the State Highway Access Code, the access roadway shall not exceed a maximum <br />grade of 8 percent within the highway right-of-v+'a}'. as measured 50 fzet beyond the pavement edge and extending <br />to the riJn-of-way lint. The access vertical grade shall he designed and constructed in conformance with the <br />Department M & S standard M-203-1. <br />42. The design of the horizontal and vertical sight distance shall be no less than the minimum requirements, as <br />• providzd in section 4.3 of the State Highway Access Code, 2 CCR 601-1. <br />43. All required access improvements shall be installed prior to the herein-authorized use of this access. <br />44. The access shall be surfaced immediately upon completion of earthwork construction and prior to use. <br />45. Compaction of Hot Bituminous Pavement shall be in accordance with section 401.17 of the Department's standard <br />specifications. Compaction of the Aggregate Base Course shall comp)}' with section 304.06. <br />46. Compaction of subgrade. embankments and backfill shall be in accordance to section 203.07 of the Department's <br />standard specifications. <br />47. Any mud or other material tracked or otherwise deposited upon the existing roadway surface shall be removed as <br />necessary to accommodate traffic, or as directed by the department. <br />48. Placement of base course materials shall be in accordance with section 304.04 of [he standard specifications. <br />Compaction shall be in conformance with AASHTO procedure T-99. <br />49. The surfacing shall meet the Department's specifications as outlined 1,laterials Recommendations obtained from <br />the Region 3 Materials Engineer. Contact the Access Manager at (970) 248-7231 to request a materials <br />recommendation. <br />50. The new State Highway pavement shall slope on the same plane as the present pavement surface. <br />51. Slopes shall be at a 6:1 ratio on the roadway and a 6:1 ratio on the approach. <br />52. The existing asphalt adiacznt to all new pavement shall be saw cut and removed a minimum of one foot back from <br />[he existing edge, or until an acceptable existing cross slope is achieved to assure a straight edge for the joint. <br />53. The top layer of plant mix bituminous pavement shall not be placed between October I and April 1, unless <br />otherwise approved by the Department. <br />54. If frost, water or moisture is present in the subgrade, no surfacing materials shall be placed until all frost, water or <br />• moisture is gone or removed. <br />4- <br />