Laserfiche WebLink
EXHIBIT A - Leeal Description <br />The west X63' of the north 760' of the NW 1/4 of the NW 1/4 of Section 31, T9N, <br />R43 W of the 6`h P.M. in Phillips County Colorado. Said portion of the NW '/ will <br />contain approximately 9.9 acres. Delineator boundary posts will be set to mark the pit <br />area as shown on the attached maps. <br />EXHIBIT B -Site Description <br />Vegetation - <br />The area is currently farmed. It was in wheat last summer and currently has <br />wheat stubble. <br />Wildlife- <br />No significant amount of wildlife has been encountered during any of the visits to <br />the site. There are no known threatened or endangered species in the area. <br />Soils information - <br />The Soil Conservation Service soils map shows the soil in the pit area as being <br />Rago, Kuma, and Platner loams. These soils often border intermittent <br />drainageways and yield sand and gravel at a depth of about 24 inches. <br />Water Resources - <br />The pit site is located on an unnamed intermittent creek, which eventually ties to <br />Frenchman Creek. This is normally a dry creek, flowing only in periods of heavy <br />run-off. Since the creek has been farmed, there is no defined channel width. <br />During periods of heavy rainfall, the flow will enter and sweep the pit area, often <br />depositing more gravel. Because the sand and gravel at the bottom of the creek <br />allows rapid percolation, water will not stand more than a few days at the most. <br />The excavation will be such that ground water elevations will not be encountered. <br />No existing water rights will be injured. <br />EXHIBIT C - Minin¢ Plan <br />Access is available off County Road 49, directly into the creek/pit area. <br />Sand and gravel will be mined over the entire pit azea. Topsoil will be stockpiled <br />to the north side of the pit prior to commencement of mining. The azea north of the creek <br />will be mined first. Mining will proceed from the creek northward. The southern portion <br />will be the last portion mined. Excavation will continue as gravel is needed for local road <br />operations and as the supply remains available. It is anticipated that mining will be from <br />15-20 feet deep, but if supply is abundant, mining could go deeper. <br />Some stockpiling may be done at the site, but most of the gravel will be utilized <br />as it is mined. Any stockpiling that does occur will parallel the creek bed so as not to <br />restrict flow. No processing of material is anticipated in the pit. <br />