Laserfiche WebLink
2 plus acre feet or enough for a five year event. The depth is to the lower <br />lip of the decant pipe or freeboard. [did not have an opportunity to inspect <br />the expansion prior to snowfall but will do so as soon as 1 can access the <br />property in the spring. <br />3) Letter and attached map from the local USFS Ranger District granting access <br />over the survey parcels within the permit boundaries. <br />4) Certification of the CDPS General Permit for Stormwater Discharges. <br />5) Water Lease Agreement with the Upper Arkansas Water Conservancy District <br />for .5 acre feet of water and a letter from the Office of the State Engineer <br />saying they are comfortable with the situation. <br />Jim, paragraph no. 5 of your letter of 10/24/01 states that proof of publication and all <br />other notices must be submitted prior to review. A search of all my files indicates that all <br />proofs were filed with the original submittal. I have copies in my file indicating this. <br />Check your file, if these are not present I will see what I can round up. <br />When you get around to reviewing the enclosures let me know if the file appears <br />complete. <br />Respectfully, <br />onsult~ olorado Lime <br />