Laserfiche WebLink
<br />~~ <br />PART I <br />Page lb(i) of 19 <br />Permit No.: CO-0026981 <br />A. TERMS AND CONDITIONS <br />2a. Effluent Limitations <br />Beginning January 1, 1991 and lasting through June 30, 1992, the <br />permittee is authorized to discharge from outfall serial number(s): <br />001, 002, 003, 004, and 005, the outfalls which are prior to mixing <br />with Canyon Creek, ae shown in figure 3. <br />In accordance with the Water Quality Control Commission Regulations <br />for Effluent Limitations, Section 10.1.3, and State Discharge Permit <br />System Regulations, Section 6.9.2, 5 C.C.R. 1002-2, the permitted <br />discharge shall not contain effluent parameter concentrations which <br />exceed the following limitations, discharge more than the mass <br />pollutant loadings specified below or exceed the specified flow <br />limitation. <br />Effluent Parameter <br />Discharge Limitations <br />30-Day Avg a/ Daily Max c/ <br />Flow, MGD * N/A - Report N/A - Report <br />Total Suspended Solids, mgll 20 30 <br />Total Recoverable Cadmium, mg/1 0.0045/0.0060/0.0027** 0.0090/0.012/0.0054** <br />Total Recoverable Copper, mg/1 0.047 /0.11 /0.030 0.094 /0.22 /0.060 <br />Total Recoverable Lead, mg/1 0.087 /0.18 /0.072 0.17 /0.36 /0.14 <br />Total Mercury, mg/1 0.00024/0.00058/0.00018 0.00048(0.0012/0.00036 <br />Total Zinc, mg/1 0.50 /0.50 /0.50 1.0 /1.0 /1.0 <br />Total Dissolved Solids, mg/1 N/A Report <br />Total Cyanide, mg/1 N/A Report <br />pH - standard units shall remain between 6.5 and 9.0 c/. <br />Oil and Grease shall not exceed 10 mg/1 in any grab sample nor shall there be a <br />visible sheen c/. If a visible sheen or floating oil is observed, corrective <br />action shall be taken immediately. There shall be no discharge of floating <br />solids. <br />* If continuous or increased flows do occur from discharge points 002, 003, <br />004, and 005, a flow limitation may be reevaluated, and pertinent permit <br />conditions may be amended. <br />** November 1 through April 30/May 1 through July 31/August 1 through October 31 <br />See Part I.C. for Footnotes. <br />Code: 1 - 2 Date: 1-84, revised 12-87 Amended / /P/~ <br />Corrected 01/25/89 <br />