Laserfiche WebLink
<br /> <br /> 7. Office, remove concrete footings 8 CY $65 $ 520 <br /> 8. Scale, remove concrete base 10 CY $65 $ 650 <br />y 9. Berm, cut a portion of the berm and spread <br />- <br />~ `' as overburden on-site, SOsf per 2,400 of berm 4,500 CY $1.25 $ 5,625 <br />~ l0.Topsoil, grade at 6 - 12 in 18,000 CY $1.25 $22,500 <br /> 11.Seed and mulch 24 Ac $800 $19,200 <br />F. Lakeshore final grade with overburden and topsoil <br /> 1. Replace overburden, 12 in on 2 ac 3,225 CY $1.25 $ 4,032 <br />a ti,:~ 2. Replace topsoil, 6 - 12 in 1,700 CY $1.25 $ 2,125 <br /> 3. Seed and mulch 2 Ac $800 $ 1,600 <br /> 4. Trees 40 Ea $ 40 $ 1,600 <br /> 5. Shrubs 80 Ea $ 25 $ 2,000 <br />G. ;, Lakeshore seeded <br />~ " I. Seed and mulch 2 Ac $800 $ 1,600 <br />H. Wetlands (See Page L-3) 1 Ea $44,525 $44,525 <br />Disturbance Costs $158,082 <br />Contractor Mob/Demob (8%) $ 12,647 <br />Overhead (18.5%) $ 29,245 <br />Administrative (5%) $ 7,904 <br />Total Proposed Financial Warranty $107,878 <br />Disturbed Acreage 40 <br />Financial Warranty per Acre $ 5,197 <br /> <br />L-2 <br />