Laserfiche WebLink
• t • • <br />EXHIBIT L <br />Reclamation Cost Estimate <br />In order to calculate maximum potential reclamation liability to the State, we have selected a <br />point in time where the mining disturbance could be at its maximum. This point occurs during <br />the mining of the southern end of Mining Cell 2. At this time, the roads and field conveyor will <br />be at the longest length and several hundred feet of Lakeshore will be under reclamation. In <br />addition, the processing plant area will be fully constructed and utilized. Please refer to page D-2 <br />where a total of 40 acres is disturbed. <br />It is important to note that all roads and culverts will remain for the use of the ranch. In addition, <br />the acceleration and deceleration lanes located in the CDOT right-of--way will remain. Buildings <br />and roads in the ranch headquarters area will also remain as permanent structures. <br /> UNIT <br />ITEM QTY UNITS COST COST <br />A. Stripped overburden and topsoil including the <br />location of the drag-line and windrow <br />1. Remove raw material, stockpile, dozer into lake, <br />` 200 ft. push 3,000 Ton $.75 $ 2,250 <br />~ 2. Replace overburden, 2 ft 500 ft haul, over 5 ac 16,000 CY $1.25 $20,000 <br />3. Replace topsoil, 6-12" 500 ft haul, over 5 ac 5,000 CY $1.25 $ 6,250 <br />4. Seed and mulch 5 Ac $800 $ 4,000 <br />~ 7~ B. Topsoil and overburden stockpiles <br />See item F below for these costs <br />,, ,s C. Roads To remain <br />D. Field conveyor <br />1. Remove concrete supports 75 Ea $5.00 $ 375 <br />~ <br />a ~ 2. Replace topsoil, 6" - 12" over 1 ac 1,000 CY $1.25 $ 1,250 <br />3. Seed and mulch 1 Ac $800 $ S00 <br />E. Processing Plant Area <br />1. Surge pile, remove conveyor and concrete <br /> foundation 1 Ea $400 $ 400 <br />2. Crushers and screens, remove concrete pad, <br /> 20'X20'Xl' 15 CY $65 $ 975 <br />3. Wash plant, remove concrete pad, 20' X 20' X 1' 15 CY $65 $ 975 <br /> Fill settling pond with dozer 700 CY $.75 $ 525 <br />4. Asphalt plant, remove concrete pad, 80' X 20' X 1' 60 CY $65 $ 3,900 <br />5. Concrete plant, remove concrete pad, 50' X 20' X 1 ' 37 CY $65 $ 2,405 <br />6. Shop, demo and remove 8,OOOsf X 20' 16,000 cf $.OS $ 8,000 <br />L-1 <br />