Laserfiche WebLink
/99 <br />• LIMITED IMPACT(I10)OPERATION • <br />EYHIBIT D <br />RECLAMATION PLAN <br />3.1 RELCAMATION PERFOR,~IANCE STANDARDS <br />3. I.I Establishing Post-Mining Use <br />(1)Gravel pit area will return to previous status i.e. range land. <br />(2) See Exhibit C: Mining Plan <br />See Exhibit E: Maps on location <br />3.1.2 Reclaimine Substiruted Land <br />Does not apply <br />3.1.3 Time Limit and Phased Reclmation <br />Topsoil and gravel/fill pit area miniryg plan of 1999 will be reclaimed in 2004, <br />unless eranted an extension as stated in 3.1.3 section. <br />3.1.4 Public Use <br />Does not apply <br />3.1.5 Reclamation Measures -Materials Handling <br />(1) Grading will be appropriate for rangeland as dictated by U.S. Soil <br />Conservation District (USSCD) and topsoil area will be reclaimed to pond as <br />dictated by USSCD. <br />(2) Does not apply <br />(3) Slopes will be graded and seeded to prevent erosion <br />(4) See information under Rule 3. l.3 of proposed Reclamation Plan <br />(~) Does not apply <br />(6) Does not appl}' <br />(7) See Exhibit C: Topsoil Ivtining Plan <br />(3) Does not apply <br />(9) Does not apply <br />2/6 <br />(10) Does not apply <br />