Laserfiche WebLink
O I! 18/99 LIMITED IMPACT (I 10) OPERATION <br />EXHIBIT C <br />MINING PLAN <br />hoop <br />Projected Topsoil Mining Plan for 1'994: ~ _-p ~Q,,~,,~ <br />Proposed beginning date:-IaFsfe#r-15, <br />POB => West I50 ft., North lib ft., depth 10 ft. (8333 cu yards) <br />i Slopes for pond under w er => 2: I <br />As directed in Rule .1.5 #7 <br />Slopds for pond above//water => 3: I <br />As directed in Rulk 3.1.5 #7 <br />Storing <br />Dug and1hauled t6 stockpile site from POB, North 800 ft., Northwest <br />200 ft. <br />Projected gravel/fill~m serial Alining Plan <br />800ft. Noform POB, 150 ft. East, North 200 ft., West 400 ft., South <br />200 ft., E st 350 ft. <br />Averag depth: `1\ . (53,330 cu. yards.) <br />Approximate loc ion for stockpile for gravel/fill: <br />800 .North from POB~then Northwest 100ft <br />Approximate location for stockpile of topsoil form gravel pit area: <br />800 ft. form POB, 350 ft. Northeast, 250 ft. Northwest along Northeast <br />boundary <br />