Laserfiche WebLink
9 <br /> Estimate of Cost of Reclamation—Howard Creek Pit#1 and#2 <br /> Backfilling... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ..... None Anticipated <br /> Grading... ... ... ... ...9 acres,bulldozer(a,$1 I0/hr, 12' swath, 1 mphr grading rate, <br /> 12'swath equals 18 times 209 = 3762 ft times 9 acres= 33858 linear feet of grading <br /> divided by 5280 feet per hour=7 hours bulldozer time =... ... ... ... ... ... .....$770.00 <br /> Topsoil Application... ... ... ... ... ... ... ... ... ... None Available, None Anticipated <br /> Seed Cost... ... ....$200/acre times 9 acres, applied ... ... ... ... ... ... ... ... .... $1800.00 <br /> Mulch Cost... .....$100/acre times 9 acres, applied... ... ... ... ... ... ... ... ..... $900.00 <br /> Crimping Cost, disk/ tractor cost, $60/hr, one acrelhour rate... ... ... ... ..... $540.00 <br /> Fertilizer Cost estimate, applied, $50/acre... ... ... ... ... ... ... ... ... ... ... ...... $450.00 <br /> Mobilization/Demobilization Cost... ... ... ... ... ... ... ... ... ... ... ... ... ... ..... $1000.00 <br /> Total Reclamation Cost including Labor Cost... ... ... ... ... ... ... ... ... ... .... $5460.00 <br /> Estimated cost per acre for seed, fertilizer, mulch, labor... ...... ... ... ... .... $606.00 <br /> This operation will reach point of maximum disturbance near the end of mining of Pit 41, <br /> 3.4 acres disturbed and app. 1.5 acres in Stockpile at Pit 92 for total of 5 acres. <br /> All equipment costs include fuel, lubricants, operating labor and overhead cost estimates. <br /> 23.5% addition to cover indirect costs and administrative costs in the event of bond <br /> forfeiture and permit revocation (Rule I I7(4)(a). (4)... ... ... ... ... ... ... ... ... $1284.00 <br /> Total Reclamation Cost Estimate for Bonding... ... ... ... ... ... ... ... ... ... ..... $6744.00 <br /> 0 <br /> 9 <br />