My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53380
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:50 PM
Creation date
11/20/2007 3:45:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification of Report Phase IV
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />2002 <br />Drawing l0a <br />Drawing 11 <br />Drawing 12 <br />Drawing 13 <br />Drawing 14 <br />Drawing 15 <br />Drawing 16 <br />Drawing 17 <br />Drawing 29 <br />-iv- <br />003-2203 <br />Phase IVa High Volume Solution Collection Piping Layout Sheet 1 of 1 <br />Phase IV Valley Leach Facility Cross Sections <br />Phase IV Underground Working Remediation Details <br />Phase IV Underdrain Details <br />Phase N Leak Detection and Erosion Control Details <br />Phase IV Surface Water Diversion Details Sheet 1 of 2 <br />Phase IV Surface Water Diversion Details Sheet 2 of 2 <br />Phase N VLF Sections and Details <br />Bateman Creek Pond Design and Sections <br />LIST OF APPENDICES <br />U <br />r1 <br />\J <br />Appendix A Record (As-built) Drawings <br />Record Drawing No. 1 General Composite Overview <br />Record Drawing No. 2 Primary and Secondary Underdrain As-built <br />Record Drawing No. 3 Top of Soil Liner Fill As-built <br />Record Drawing No. 4 Leak Detection Trench As-built <br />Record Drawing No. 5 Geomembrane Record Drawing: Ore Storage Area <br />Appendix B Photographic Documentation <br />Appendix B-1 Photograph Log <br />Appendix B-2 Documentary Photographs <br />Appendix C Staff Schedule for Golder Personnel <br />Appendix D Weekly Reports <br />Appendix E Specifications <br />Appendix F Surveyor's Certificate <br />Appendix G Subgrade Acceptance Forms <br />Appendix H Concrete Observation and Testing Results <br />Appendix I CQA Laboratory Test Results <br />Appendix I-1 Grain Size Distribution, Moisture Content and Atterberg Limits <br />Appendix I-2 Compaction Tests <br />Appendix I-3 Soil Liner Fill Permeability Tests <br />Appendix J Geomembrane Quality Control Documents and Inventory <br />Appendix J-1 Geomembrane Inventory Control <br />Appendix J-2 Resumes of Installation Personnel <br />Appendix J-3 Geomembrane Resin Quality Control Certificates <br />Appendix J-4 Geomembrane Roll Quality Control Certificates <br />Appendix J-5 Welding Rod Quality Control Certificates <br />Appendix J-6 Geotextile Roll Quality Control Certificates <br />Appendix K Geomembrane Installation Observations <br />Appendix K-1 Conformance Test Results <br />Appendix K-2 OSA Deployment Observations <br />Appendix K-3 OSA Trial Seam Summaries <br />Appendix K-4 Tensiometer Certification <br />~:~oo~zzo3waamcmrt~osoz~ooszzo3onooaa~arnxieoc GolderAssotlates <br />
The URL can be used to link to this page
Your browser does not support the video tag.