Laserfiche WebLink
2002 -iii- 003-2203 <br />• <br />• <br />LIST OF TABLES <br />Table 1 Summary of Earthworks Material Specifications <br />Table 2 Summary of Weather Data <br />Table 3 Underground Remediation Summary -Phase Na Underground Workings <br />Table 4 Earthworks CQA Test Summary and Testing Frequency <br />Table 5 CQA Laboratory Test Summary, Underdrain Fill <br />Table 6 CQA Laboratory Test Summary, Select Structural Fill <br />Table 7 CQA Laboratory Test Summary, Leak Detection Fill <br />Table 8 CQA Laboratory Test Summary, Structural Fill <br />Table 9 CQA Laboratory Test Summary, Soil Liner Fill <br />Table 10 CQA Laboratory Test Summary, Drain Cover Fill <br />Table 11 CQA Laboratory Test Summary, Fine Shaft Backfill <br />Table 12 CQA Laboratory Test Summary, Pipe Bedding Material <br />Table 13 Field Density and Moisture Content Test Summary, Soil Liner Fill <br />Table 14 Soil Liner Fill Depth Verification Summary <br />Table 15 CQA Laboratory Test Summary, Concrete <br />Table 16 Field Density and Moisture Content Test Summary, Structural Fill <br />Table 17 Field Density and Moisture Content Test Summary, Pipe Bedding Fill <br />Table 18 CQA Laboratory Test Summary, Granular Filter Material <br />LIST OF FIGURES <br />Figure 1 Cresson Project VLF Site Plan <br />Figure 2 Certification Boundary <br />Figure 3 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />Figure 4 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />LIST OF IFC DRAWINGS <br /> <br />Drawing 2a Phase Na Existing Valley Leach Facility Site Conditions Sheet 1 of 1 <br />Drawing 3 Site Geology Map <br />Drawing 4 Site Grading General Plan <br />Drawing Sa Phase IVa Site Grading Plan Sheet 1 of 1 <br />Drawing 6a Phase Na Known Underground Workings and Surface Reconnaissance <br />Sheet 1 of 1 <br />Drawing 7a Phase Na Remediation Areas and CuUFill Isopach Sheet I of 1 <br />Drawing 8b Phase N Permanent Surface Water Diversion Plan and Profile Sheet 2 of 4 <br />Drawing 8c Phase IV Permanent Surface Water Diversion Plan and Profile Sheet 3 of 4 <br />Drawing 8d Phase N Permanent Surface Water Diversion Plan and Profile Sheet 4 of 4 <br />Drawing 9a Phase Na Site Survey Control Plan <br />Only drawings relevant to Phase IVa construction aze presented. <br />is\00\2203\0400\CenRep0802\00332010400.0414oaz.d« Golder Associates <br />