My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53380
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:50 PM
Creation date
11/20/2007 3:45:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification of Report Phase IV
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2002 -18- 003-2203 <br />I • 3.0 GEOSYNTHETICS INSTALLATION <br />Geosynthetics installed in the Phase IVa Area consisted of geotextile, geogrid, and <br />geomembrane. Twelve-ounce, non-woven geotextile manufactured by Amoco Fabrics and <br />Fibers Company (Amoco) of Austell, Georgia, and 40-mil smooth LLDPE geomembrane <br />manufactured by Poly-Flex of Grand Prairie, Texas were used to construct the LDT for the <br />Phase IVa Area. The Phase fVa OSA composite Iiner system included 80-mil single-sided <br />textured LLDPE geomembrane manufactured by Poly-Flex of Grand Prairie, Texas. The <br />Underdrains were constructed with 12-ounce non-woven geotextile manufactured by Amoco. <br />Geogrid manufactured by TENSAR was used in the remediation of select underground <br />workings as noted in Section 2.1. <br />3.1 Underdrains <br />• Geosynthetics installation for the Primary and Secondary Underdrains was performed by Ames, <br />and included deployment of 12-ounce non-woven geotextile. Ames installed approximately <br />56,162 square feet of geotextile to construct the Underdrains. Underdrain construction is <br />discussed further in Section 2.2. <br />3.2 Leak Detection Trench <br />Ames installed 12-ounce non-woven geotextile and 40-mil smooth LLDPE geomembrane in <br />the LDT for the Phase IVa Area. Ames installed approximately 11,380 square feet of <br />geotextile and 6,828 square feet of geomembrane for the LDT. To construct the LDT, Ames <br />placed a layer of 40-mil smooth LLDPE geomembrane in the LDT, and laid geotextile over <br />the geomembrane. After piping and LDF were placed in the trench, the geotextile was <br />wrapped around the fill with a minimum 1-foot overlap, as shown in Detail I, Drawing 14. <br />Poly-Flex extrusion welded geomembrane seams in the LDT. LDT construction is discussed <br />• further in Section 2.3. <br />~:~omzzoowaomcnwroosozwoszzo3.oaao.oa~aam.doc Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.