Laserfiche WebLink
-J- <br /> <br />"~ <br /> <br />.-, <br />:..4 <br />ti <br />J <br />.~ <br />,~. <br />~• <br />E. Summary of Conpli,,oce <br />The ;applicant will continue [o he in compliance if all stipulations <br />in Section D sre adhered tn. OStt will he compliance when the Colorado <br />SIII'0 concurs with .+ "t:o Effect" or "No +5<iverse Effect" determination. <br />F. Proposed De partnent Action <br />The Secretary could ;approve the Coln~ryo nine plan with the proposed <br />special stipulations. <br />C. Residual Impacts of Proposed Department Action <br />Unknown cultnrol resources with potential significant information may <br />also be ,iestroye+l by applicant activities or as a result of increased pop' <br />elation. Adverse impacts to unknown cultural resources through vandalism <br />and una~~thorized collection can be a:~tlcipated. <br />The cultural « snurccs (presently 2) that are not eligible for nomination <br />Co [he tJItIIP a[ Ch Ls time may contaLn Lnfurnatfon [ha[ would Fxe considered <br />significant at soma tine in the fut~+rc. Tiie potential loss of this data <br />through direct ur indirect site disturbance exists. <br />It. Resource Alternatives to Proposed Action <br />One alternative would be not to <br />would be directly impacted. Another <br />cultural reso~~rces during mining ol~e <br />[ion of the known c~iltural resources <br />tJational Register criteria), neither <br />considered prudent nr feasible. <br />mine and <br />alternat <br />rations. <br />does not <br />of these <br />thus, no cultural resources <br />Lve would be to avoid all <br />Because In-place preserva- <br />seem warranted (based upon <br />alte-natlves are at present <br />I. Environmental Impacts of Alternatives to Proposed Ac [ion <br />The beneficial impacts of data recovery t!irouglt impact mitigation, <br />iE it is considered necessary, would not be realized if mining acr:vities <br />are I>ruliihited or if avoidance of all know cultural sites is enforced. <br />Dlssal+proval ur :IVOfdnnce cannot eliminate data loss Cl+rough unauthorized <br />disturbance or v;~nd:~lism, nor can it slow on-going natural processes such <br />as erosion, weathering and decay. Since approval of the mine plan with <br />stipulations will iilnw for :my necessary data recovery prior [o addi- <br />[fun.il site disturbance by cultural or natural agents, it is considered to <br />he the alternative that will ent.ill the minimum adverse impact and maximum <br />beneficial impact to cultural sites. <br />• <br />.~ <br />.j <br />