Laserfiche WebLink
<br />r <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No. Task Description Cost (f) <br />-------- I ---------------------------------------------- I ------------ <br />I n/a I <br />I I <br />I I <br />I I <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No. Task Description I Cost (f) <br />--------I-----------------------------------------------I---~------ <br />I n/a I <br />I I <br />I I <br />I I <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. Task Description Cost (f) <br />-------- I ------------------------------------------------- I ----------- <br />I I <br />I Demolition I <br />5 Seeding Intl mulch, fert. one drilling f2.B54 <br />Fencing assume no new or repaired needed I <br />Mob/Demob from Alamosa f2,238 <br />Subtotal (M): f5,092 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): f8.189 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.l Item Description I Cost (f) <br />1. Public Liability Insurance.... 1.550% of dir. 5127 <br />2. Contractor's Performance Bond 0.975% of dir. SBO <br />3. Contractor's Profit........... 10.00% of dir. f819 <br />4. Job Superintendent.. <br />Subtotal (A): f1.026 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 59.215 <br />B. DMG PROJECT ADMi NISTRATION EXPENSES <br />Item No.l Item Description Cost (i) <br />------ I ---------------------,---------------~----------- I ----------- <br />I I <br />1. Minerals Program Adm 5.00% of cntr. f461 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B ): 5461 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f1.486 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): f9.615 <br />