Laserfiche WebLink
<br /> <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.l Task Description Cost (f) <br />-----'-- I ------------------'------------------------- I ---------- <br />I n/a I <br />I I <br />I I <br />I I <br />Subtotal (H): <br />I. EARTHWORK -DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description I Cost (fJ <br />------- I -------------------------------------------------- I ------------ <br />I n/a I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />------- ----- <br />Subtotal (I): <br />J. EARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT <br />Task No. Task Description Cost (f) <br />--------I----------------------~---------------------------I----------- <br />4 (Topsoil replacement -all unreel ai med di sturbance f2, 113 <br />assume 6 ac, 6" depth max <br />may incl subsoil if avail onsite. <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />Subtotal (J): 52.113 <br />