My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE53238
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE53238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:56:45 PM
Creation date
11/20/2007 3:40:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979097
IBM Index Class Name
Permit File
Doc Date
5/22/1979
Doc Name
FLATIRON MATERIALS CO APPLICATION FOR MINING & RECLAMATION PERMIT EAST RIGDEN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />pumped from the dewatering trench so that gravel can be mined <br />dry. NPDES permit CO-0035200 has been issued for this operation. <br />Size of Areas - Phasing - Disturbances <br />Mining will follow the sequence described above and will be <br />conducted in B stages. First, overburden will be stripped <br />from the area to be mined with a scraper. A dewatering trench <br />around the area to be mined will be dug by backhoe. Ground <br />water percolating through the gravel strata will collect in the <br />trench and be pumped from its lowest point to flow eventually <br />into the Cache la Poudre River. Front end loaders will excavate <br />the dewatered gravel face leaving a base of approximately 8 <br />inches of gravel above the bedrock shale. If a backhoe is used <br />for excavation, no gravel base will be left above shale. <br />A portable crushing/screening plant will be located south of <br />the intersection of Boxelder Ditch and Co. Rd. 9. Pit run <br />gravel will be taken to the crusher by front ^nd loader or truck <br />and conveyors. The crushing/screening operation will produce <br />aggregate for road base, concrete and hot mix. Road base ~-ill <br />be stockpiled strategically near the crusher to be hauled to <br />construction sites during the construction season. Hot mix <br />will be produced on site by a portable asphalt plant, and concrete <br />by a concrete plant. <br />If economic conditions remain as projected, preparatory work <br /> <br />D- 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.