My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23169
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:48 PM
Creation date
11/20/2007 3:34:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
1/11/1997
Doc Name
3RD & 4TH 1996 Inspections
From
BASIN RESOURCES INC
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. ., ~ - <br />. <br />~ <br />1 ~ <br />` <br />' <br />' <br />~ . <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond ~o/~eN ~~ ~ae[yl Goa-r~// NPDES No. !'~~3 <br />Date of Inspection ~ ~D / `T9 <br />EMBANKMENT <br />1. Adequacy of [he vegetative cover: xcellen <br />2. Erosion forming gullies: Extensive, <br />Moderate, Few, Poor <br />Some, ery Few, None <br />3. Is wave action causing erosion: <br />On the upstream embankment? <br />At the principal spillway inlet? <br />4. Erosion of the downstream toe of the embankment? <br />The cause of the erosion is attributed to: <br />~. Is se>_page occunng through .re dam'? <br />Could this seepage cause potential irstabdiry? <br />E:cplain: <br />PRINCIPAL SPILLWAY <br />1. Is the principal spillway rystem in working order? <br />2. Is the inlet free of debris and restrictive material? <br />3. [s [he dischazge outlet free of restrictive material? <br />Yes No ~~ <br />Yes 1Vo_1L <br />Yes 1Vo L- <br />Yep i+o L~ <br />Yes iYo . <br />Yes y ~Vo <br />Y'es ` No <br />Yes L- :vo <br />~. Is erosion occurring at the dischazge outlet? Yes Vo L~ <br />Evaluate the severity: Extensive Moderate Just Staring None <br />EMERGENCY SPILLWAY <br />1. Is the overall emergency spillway rystem capable of passing design storm dischazge? <br />Yes _~ vo <br />2. Does i[ appear as if the emergency spillway has discharged water since the last inspection? <br />Yes Vo ~- <br />J. Is erosio^ occurring at any section of the emergency spillway? Yes No L~ <br />Describe the extent: <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design storage capacity of the reservoir been surpassed'? Yes v No <br />If yes, explain: ~'rr.,~e ~.(c~( /a it/ SHPT ?O i f ~~ - <br />Please add any special comments Concerning potentially dangerous problems oo the at:k of this <br />sheet! <br />Inspected by: /~-~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.