My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO23169
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO23169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:48 PM
Creation date
11/20/2007 3:34:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Hydrology
Doc Date
1/11/1997
Doc Name
3RD & 4TH 1996 Inspections
From
BASIN RESOURCES INC
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i <br />BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM <br />Pond Cia~c~e:~ c~.~-y.~ i'ylinc l.~Jti~r NPDES No. 6a Z <br />Date of Inspection ~G, o 9 6 <br />EMBANKMENT ~GCC=-/~ Iv~~~ <br />I. Adequacy of the veg ve cover: Exc Moderate, Few, Poor <br />2. Erosion forming gullies: Extensive, Some, Very Few, None <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes No <br />At the principal spillway inlet? Yes No <br />4. Erosion of the downstream toe of the embankment? Yes No <br />The cause of the erosion is attributed to: <br />~. [s seepage ocnu-ring through the dam'? 1'es' No _ <br /> C, uld this seepage cause potential instability? ''.'es ___ No_ _ _ <br /> Explain: <br /> <br />P RINCIPAL SPILLWAY <br />1. Is the principal spillway system in working order? Yes No <br />2. Is the inlet free of debris and restrictive material? Yes No <br />3. Is the discharge outlet free of restrictive material? Yes No <br />4. Is erosion occurring at the discharge outlet? Yes No <br /> Evaluate the severity: Extensive Moderate Just Starti ng None <br />E MERGENCY SPILLWAY <br />1. Is the overall emergency spillway ystem capable of passing design storm discharge? <br /> Yes No <br />2. Does i[ appear as if the emergency spillway has discharged water since the last uupect ion? <br /> Yes No <br />3. Is erosion occurring at any section of the emergency spillway? Yes No <br /> Describe the extent: <br /> <br />SEDIMENT STORAGE CAPACITY <br />1. Has the design stora e capacity of the reservoir been surpassed? Yes No <br />If yes, explain: Ol^ /~ 2 C P (v r ,n , ,-t,e_ (ici I ~~ut~ <br />~ P Q^G, <br />(,l~l ~ Gt.i` ¢o` ova-- ~f'/ G P .~ <br />Please add any special comments concerning potentially dangerous problems on the ck of this <br />sheetf <br />Inspected by: ~w~'t~-~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.