Laserfiche WebLink
• 11. On-Site Processing <br />Cre and rock product materials will be processed on-site <br />according to the proposed following flow sheet: <br />PROPOSED_HEAVY MEDIA PLANT LAYOUT <br />[ { NEEDED TO } Dump Material ] <br />[ { COMPLETE PLANT } V ] <br />[ Grizzly ->->->-> +14" Waste ] <br />[ v ] <br />[ Primary ] <br />[ Crusher ] <br />[ V ] <br />[ 1 1/4" Rc,~l Crusher->->->->V ] <br />[ v ] <br />[ 1000 Ton Storage Bin & Pan Feeder ] <br />_ V <br />[ \EXISTING PLANT/ / Screen ] <br />[ +3/16" / V ] <br /> <br /> <br />[ V<- 1/32" 2.8 S.G. \ Screen 1/4" ] <br />• <br />[ V Screen Cone Separator V ] <br />[ V 8 Wash V V ] <br /> <br />[ v V "-<<<<-<-<-<-V tail V ] <br />[ V V V V ] <br />[ V V 1/32" V ] <br />[ V Ferrosilicon <-<-<-<-- Screen V ] <br />[ V Recovery Unit ~ Wash V ] <br />[ V V V V ] <br /> V V V V <br />[ V \NEEDED TO COM PLETE PLANT/ V V ] <br />[ V V V V ] <br />[ V V V-<-<-<-<-V V ] <br />[ V V V Hydrauli c Classifier <br />[ V V V V ] <br />[ Concentrate V V ] <br />[ Stockpile Stockpile V V V V ] <br />[ (Coarse) (Coarse tail) Jig Jig Jig Table ] <br />[ 3/16 +1/ 8 +1/16 V ] <br />[ V V V V ] <br />[ Concentrate <-- <--<--<--<--<--<--<- V V V V ] <br />[ Stockpile Tails (Fine) ] <br />[ (Fine) ] <br />The primary plant facilities as indicated in the preceding flow <br />• chart are in place on the site. The additional equipment as <br />indicated, will be located in the existing facility. <br />11 <br />