Laserfiche WebLink
Colorado Department of Public Heap id Environment <br />Air Pollution Control Division <br />-MINING OPERATIONS - <br />D. OVERBURDEN STOCKPILES <br />Maximum Stored At One Time NA Tons <br />Proposed Controls For Overburden Stockpile: <br />^ Watering Times/Day <br />^ Chemical Stabilizer <br />^ Compacting Of Piles <br />Page 3 of 6 <br />^ Enclosures (Complete or Partial) <br />^ Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br />^ Other (specify) <br />E. DRILLING <br />Number Of Holes Drilled Per Day: NA <br />Number Of Holes Drilled Per Year: NA <br />Proposed Controls For Drilling: <br />^ Water Injection <br />^ Chemical Stabilizer <br />^ Bag Collectors <br />^ Other (specify) <br /> <br />F. BLASTING <br />Number OfBlasts Per Day: NA <br />Number Of Blasts Per Year: NA <br />Type of Blasting Material Used: NA <br />Tons of Blasting Material Used: NA <br />Hours OfEmissions Per Day: NA <br /> <br />G. RAW MATERIAL REMOVAL <br />Maximum Tons Removed Per Day: 1000 <br />Tons Removed Per Year: 220000 <br />Drop Height: 2 <br />Specify Moisture Content: NA <br />Proposed Controls For Raw Material Removal: <br />® Moist Material <br />^ Water Spray <br />^ Other (specify) <br />Feet <br />%, (if known) <br />H. RAW MATERIAL STOCKPILE(S) <br />Maximum Stored At One Time: 5000 <br />Proposed Controls For Raw Material Stockpile: <br />^ Watering Times/Day <br />^ Chemical Stabilizer <br />^ Compacting Of Piles <br />^ Enclosures Type: (Complete or Partial) <br />^ Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br />® Other (specify) Moist Material <br /> <br />