My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-08-02_PERMIT FILE - M2005080
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2005080
>
2006-08-02_PERMIT FILE - M2005080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 1:14:33 PM
Creation date
11/20/2007 3:34:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005080
IBM Index Class Name
Permit File
Doc Date
8/2/2006
Doc Name
Notice of Rebuttal Exhibits
From
Attorneys for Applicant
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Department of Public Health ~ .Environment <br />Av Pollution Control Division Page 2 of 6 <br />-MINING OPERATIONS - <br /> ESTIMATED EMISSIONS <br /> Year Por Wbieh Adoal Data Applies: NA <br /> Estimated Emissions <br /> (tons/yr) nt throughputs Estimation <br />Pollutant requested Actual Emissions Method <br /> From Data Year <br /> Controlled Uncontrolled <br />Particulate 12.75 51 NA AP-42 <br />PM-10 3.41 13.6 NA AP-42 <br />A. <br />B. <br />TOPSOIL REMOVAL <br />Maximum Tons Removed Per Day. 200 <br />Tons Removed Per Year. 800 <br />Proposed Controls For Topsoil Removal: <br />® Moist Material <br />^ Water Spray <br />^ Other (specify) <br />TOPSOIIJ STOCKPII.EfS <br />^ Enclosures Type: (Complete or Partial) <br />^ Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br />^ t72her (specify) <br />Maximum Stored At One Time: _ <br />Proposed Controls For Topsoil Stockpile: <br />^ Watering <br />^ Chemical Stabilizer <br />® Compacting Of Piles <br />C. OVERBURDEN REMOVAL <br />Equipment Used For Removal: <br />Maximum Tons Removed Per Day Hy Dragline: <br />Tons Removed Per Year By Dragline: <br />Number Of Scraper Hours Per Day. <br />Number Of Scraper Hours Per Year: <br />Proposed Controls For Overburden Removal: <br />^ Moist Material <br />^ Water Spray <br />^ Other (specify) <br />1000 Tons <br />Times/Day <br />NA <br />NA <br />NA <br />NA <br />NA <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.